This project was executed on 840 m2 land in Tehran which consisting of two towers including 13 floors with total substructure over 6600 m2.This project with all of its equipments including air conditioning system, four elevators and fire suppression system was completed in 1996.
Client: Ministry Of Energy
Engineering Consultant: Iran Boland Saze Company(SABA Co.)
Start Date: 1992
End Date: 1996