This project has been carried out in Kurdestan province, saghez city. The Construction started from the reservoir tower of shahid Kazemi dam (in Bukan), 25 km mountainous road, and water refinery and finally delivers water to the drinking water network of the city.
The technical specifications of this project are listed below:
• Construction of 2 reservoirs of pre-refined and refined water with the capacity of 40000 cubic meters a day ,access road, installation of pipeline, construction of pump station and concrete reservoir tower with the height of 30 meter, chemical building , chlorinating building, laboratory building and residential buildings.
• Soil excavations: 1600000 cubic meters both embankment and excavations.
• 30 Km of steel pipeline with diameter of 900mm with a covering layer (in and outside).
• Construction of a service road in a mountainous and rocky area within 25 km.
Client: West Water Authority.
Consulting Engineer: Ramab Company Consulting Engineer
Start date: 1991
End Date: 1996