This dam is located 100 km distance from the north east of Mashhad and 15 km from Mashhad-Kalat asphalt road.The goal of construction of this dam is Collecting wasted water of boarder rivers water by making a reservoir dam for the development of agricultural trade.
• This dam is a clay core dam.
• Excavation: 722000 cubic meters
• Embankment : 780000 cubic meters
• Concrete : 60000 cubic meters
• Access road: 28km
• Crest length: 322.5meters
• Crest width : 10meters
• Height of dam from foundation : 57meters
• Diversion tunnel : 2 tunnels with the length of 235 meters and 229 meters
• Client : Khorasan Razavi Water Authority
• Consultant Engineer : Tamavan Company
• Start Date: 2006